Public Notices

WIPP Public Notices

DOE/EA-2077
North Access Road Bypass near the Waste Isolation Pilot Plant ‐ Draft A

July 2018
The Department of Energy, Carlsbad Field Office has prepared a Draft Environmental Assessment to consider the potential environmental consequences of the proposed action which is to construct a North Access Road Bypass (NARB), approximately 3 miles in length, near the Waste Isolation Pilot Plant (WIPP).