Compliance Recertification Application 2009
CRA-2009 Main
|
References
|
CFR Index
|
Search CRA-2009
|
About
Washington TRU Solutions
Washington TRU Solutions (WTS). 2003.
Specification for Prepackaged MgO Backfill (Rev. 5)
. D-0101. Carlsbad, NM: Washington TRU Solutions.
Appendix MgO
: Magnesium Oxide as an Engineered Barrier
Subsection MgO-2.2.1
, Changes since the CRA-2004 in Vendors Proving MgO
Subsection MgO-7.0
, References
Section 44
: Engineered Barriers
Subsection 44.6.1.1
, Change in MgO Vendors
Subsection 44.7
, References
Washington TRU Solutions (WTS). 2005.
Specification for Prepackaged MgO Backfill
(Rev. 7, May 12). Specification D-0101. Carlsbad, NM: Washington TRU Solutions.
Appendix MgO
: Magnesium Oxide as an Engineered Barrier
Subsection MgO-2.0Description
, of the Engineered Barrier System
Subsection MgO-2.1.1
, Supersacks
Subsection MgO-6.2.4.4.2
, Uncertainties in the Quantity of MgO that will be Available to Consume CO2
Subsection MgO-7.0
, References
Washington TRU Solutions (WTS). 2006.
CH Waste Processing
(Rev. 23, January). Technical Procedure WP05-WH1011. Carlsbad, NM: Washington TRU Solutions.
Appendix MgO
: Magnesium Oxide as an Engineered Barrier
Subsection MgO-6.2.4.4.2
, Uncertainties in the Quantity of MgO that will be Available to Consume CO2
Subsection MgO-7.0
, References