2013 Stakeholder Information Documents

Closure of Underground Hazardous Waste Disposal Unit

Notification of Panel 6 Closure and Final Waste Emplacement dated November 5, 2013


Submittal of Final Audit Reports

Transmittal of the Final Audit Report for Recertification Audit A-14-01 of the Advanced Mixed Waste Treatment Project dated December 9, 2013

Final Audit Report for the Argonne National Laboratory Central Characterization Program Recertification Audit A-13-24 dated November 22, 2013

Transmittal of the Final Audit Report for INL/CCP Recertification Audit A-13-18 dated November 19, 2013

Transmittal of the Final Audit Report for Closeout Audit A-13-19, INL Analytical Laboratories Utilizing the Central Characterization Program dated November 4, 2013

Transmittal of the Final Audit Report for LANL/CCP Recertification Audit A-13-23 dated November 4, 2013

Transmittal of the Closeout Audit for SNL-CCP, Audit A-12-15 dated August 12, 2013

Transmittal of the Final Audit Report for Recertification Audit A-13-02, SRS/CCP dated August 6, 2013

Transmittal of the Recertification Audit Report for AMWTP, Audit A-13-01 dated 7-31-13

Transmittal of the Interim and Final Audit Report for the Hanford Site/Central Characterization Program, Recertification Audit A-13-15 dated May 28, 2013

Transmittal of the Audit Report for the Oak Ridge National Laboratory/Central Characterization Program Audit A-13-12 dated May 20, 2013

Transmittal of the Final Audit Report for the INL/CCP Recertification Audit A-12-13 dated January 23, 2013


Annual Proposed Acceptable Knowledge Sufficiency Determination List


Annual Report Submittals

Transmittal of Waste Isolation Pilot Plant Annual Reports dated October 23, 2013


Submittal of Acceptable Knowledge Sufficiency Determination


Notice of Submittal of a Dispute Resolution


Notice of Proposed Capacity Increase in the Repository


Notice of Surge Storage in the Parking Unit Area


Notice of the Use of Surge Storage in the Waste Handling Building


Notice of Sampling Line Loss


Notice of Sampling Line Loss Evaluation


Explosion Isolation Wall Certification


Notification of Planned Changes

Notification of Planned Physical Alteration to the Permitted Facility, Hazardous Waste Facility Permit, No. NM4890139088-TSDF, dated June 17, 2013


Notice of Exceedance


Notification of Panel Final Waste Volume


Notice of Excavation

Notification of Projected Start Date of Excavation for Panel 8 dated June 17, 2013