Documents Library By Number

Documents Library By Number

Note: Documents that do not have document numbers are not included in this listing.


DOE/CAO

DOE/CAO 95-1095, Oct. 1995
Remote Handled Transuranic Waste Study

This study was conducted to satisfy the requirements defined by the WIPP Land Withdrawal Act and considered by DOE to be a prudent exercise in the compliance certification process.

DOE/CAO 1996-2184
Compliance Certification Application

DOE's 72,000-page application submitted to the U.S. Environmental Protection Agency showing how WIPP meets all applicable federal transuranic radioactive waste standards. (Click on CCA -1996)

DOE/CAO-00-3124, Feb. 2000
Pioneering Nuclear Waste Disposal

Documents the 40-plus year history of the Waste Isolation Pilot Plant and looks forward to challenges for the future.


DOE/CBFO

DOE/CBFO-94-1007 Rev. 8
Recovery Guide for TRU Waste Packages

Effective: 05/23/17

DOE/CBFO-94-1012, Rev. 14
Quality Assurance Program Document

Effective date: 11/06/23

DOE/CBFO 98-3103 Rev. 5
TRU Waste Transportation Plan

Effective date: 10/17/2022

DOE/CBFO-01-1005 Rev. 8
Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

Effective date: 03/31/22

DOE/CBFO-01-1006 Rev. 8
Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

Effective date: 05/24/22

DOE/CBFO-01-3107 Rev. 11
Performance Demonstration Program Management Plan

Effective date: 03/31/22

DOE/CBFO-11-3470
A Management Proposal for Salt Disposal Investigations with a Field Scale Heater Test at WIPP

June 2011

DOE/CBFO 16-3560 Rev 0
National TRU Programs Lessons Learned Plan

Effective date: 03/16

DOE/CBFO-21-3630 Rev. 0
Performance Demonstration Program Plan for Nondestructive Assay of Criticality Control Overpacks for the TRU Waste Characterization Program

Effective date: 07/27/21


DOE/EA

DOE/EA-1340, Jan. 2001
Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site

This document examines the potential environmental consequences from conducting particular types of scientific experiments in the experiment gallery at WIPP, including the potential cumulative impacts of conducting experiments with the operation of WIPP as a TRU waste repository.

DOE/EA-1404, January 2006 Final
Environmental Assessment for Actinide Chemistry and Repository Science Laboratory

This document examines the potential environmental impacts associated with the proposed construction and operation of an Actinide Chemistry and Repository Science Laboratory (ACRSL) along with other reasonable alternatives to support chemical research activities related to WIPP.

DOE/EA-1905
Adoption of Environmental Assessment DOI-BLM-NM-P020-11-1414 Double Eagle Water System

October 2011
This document examines the potential environmental impacts associated with providing DOE funding for the proposed improvements to the City of Carlsbad Double Eagle Water System.

DOE/EA-1905
Finding No Significant Impact

Department of Energy Funding for City of Carlsbad Double Eagle Water System

DOE/EA-2077, October 2018
Environmental Assessment for the Waste Isolation Pilot Plant North Access Bypass Road

This document examines the potential environmental impacts associated with the proposed construction of an approximate three mile in length North Access Bypass Road to divert traffic not related to the Waste Isolation Pilot Plant (WIPP) away from the WIPP facility and parking lot entrances.

DOE/EA-2077, October 2018
Finding of No Significant Impact: North Access Bypass Road near the Waste Isolation Pilot Plant


DOE/EIS

DOE/EIS 0026-S-2
WIPP Disposal Phase Supplemental Environmental Impact Statement (SEIS-II)

This document assesses whether to dispose of TRU waste at WIPP. This document also assesses reasonable options for transportation and other activities associated with disposal, as well as reasonable alternatives concerning quantities, sources, and treatment of TRU waste before disposal.

DOE/EIS-0200-SA-1
Supplement Analysis for the Proposed Characterization for Disposal of Contact Handled Transuranic Waste at the Waste Isolation Pilot Plant

This document examines the environmental impacts of the proposal to perform characterization activities required by the WIPP Hazardous Waste Facility Permit for contact-handled waste at the WIPP.

DOE/EIS-0026-SA-3
Supplement Analysis for the Disposal of Certain Rocky Flats Plutonium Bearing Materials at the Waste Isolation Pilot Plant

This document examines the environmental impacts of disposing of additional volumes of plutonium bearing materials from Rocky Flats at WIPP. These plutonium bearing materials have plutonium concentrations similar to the Rocky Flats plutonium residues previously authorized for disposal at WIPP.

DOE/EIS-0026-SA-4
Supplement Analysis for use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP

This document examines the environmental impacts of using the 10-160B transportation cask for transporting remote-handled transuranic waste to WIPP.

DOE/EIS-0026-SA-06
Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III containers

September 2007
This document examines the environmental impacts of using the Transuranic Package Transporter Model III (TRUPACT-III) containers for transporting contact-handled transuranic waste to WIPP.

DOE/EIS-0026-SA-07
Supplement Analysis for the Waste Isolation Pilot Plant Site-Wide Operations

May 2009
This document examines the environmental impacts of changes to WIPP site-wide and transportation operations, and new information gathered, since the preparation of the Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement (SEIS-II) (DOE/EIS-0026-S-2), and the Supplement Analysis for the Waste Isolation Pilot Plant Site Wide Operations (DOE/EIS-0026-SA05).

DOE/EIS-0026-SA-08
Supplement Analysis for the Packaging and Handling of Remote-Handled Transuranic Waste in Shielded Containers

September 2010
This document examines the impacts of the packaging and emplacement at WIPP of a portion of the RH-TRU waste inventory using a new container design called the lead shielded container.

DOE/EIS-0026-SA-09
Supplement Analysis for a Proposal to Temporarily Store Defense Transuranic Waste prior to Disposal at the Waste Isolation Pilot Plant

March 2014
This analysis evaluates the impacts of proposed temporary storage of defense TRU wastes at Waste Control Specialists, LLC prior to disposal at the Waste Isolation Pilot Plant.

DOE/EIS-0026-SA-11
Supplement Analysis for the New Permanent Ventilation System

November 2017
This document evaluates the potential environmental impacts associated with the proposed construction and operation of a Permanent Ventilation System at the Waste Isolation Pilot Plant.

DOE/EIS-0026-SA-12, Rev. 0
Supplement Analysis for the Waste Isolation Pilot Plant Site-Wide Operations

April 2021
The purpose of this SA is to perform the five-year site-wide WIPP facility evaluation. Included with this SA is a proposed change pertaining to the excavation of two underground replacement panels for the disposal of TRU waste.


DOE/TRU

DOE/TRU-23-3425 Rev. 0
Annual Transuranic Waste Inventory Report - 2023

Effective date: February 2024
The information presented in the ATWIR - 2023 serves as a current baseline of the TRU waste inventory for potential disposal at WIPP and may be considered in future Compliance Recertification Applications. The TRU Waste Inventory Profile Reports (Appendices A and B) reflect the information reported by the TRU waste sites.


DOE/WIPP

DOE/WIPP-93-004, Reprint I, October 31, 2023
Waste Isolation Pilot Plant Land Management Plan

Effective Date: 10/31/2023
Describes how the Department of Energy manages the WIPP Land Withdrawal Area.

DOE/WIPP-99-2194, Rev. 14
Waste Isolation Pilot Plant Environmental Monitoring Plan

Effective Date: 10/16/23
This document contains the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for lab analysis, QA requirements, program implementation procedures, and direction for the preparation and disposition of reports.

DOE/WIPP 99-3119 Rev. 9
Compliance Monitoring Implementation Plan for 40 CFR §191.14(b), Assurance Requirement

Effective date: 5/25/2023

DOE/WIPP-02-3122 Rev. 11
Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant

Effective date: 11/04/22

DOE/WIPP 02-3196
Waste Isolation Pilot Plant Initial Report for PCB Disposal Authorization

This document provides request authorization to allow the disposal of transuranic (TRU) wastes containing polychlorinated biphenyls (PCBs) which are duly regulated under the Toxic Substances Control Act (TSCA).

DOE/WIPP 02-3214 Rev. 5
Remote Handled TRU Waste Characterization Program Implementation Plan

Effective Date: 11/01/2023

DOE/WIPP 03-2225
Waste Isolation Pilot Plant Annual Site Environmental Report 2002

Report addressing operational environmental monitoring activities.

DOE/WIPP 03-3230
Strategic Plan for Groundwater Monitoring at the WIPP

Describes the groundwater monitoring scope, objectives, responsibilities, compliance drivers, technical considerations, and overall approach to monitoring the hydrological units below the surface within the vicinity of the WIPP repository. This document provides the hierarchy for the development of specific plans for the short and long-term monitoring.

DOE/WIPP 04-2225
Waste Isolation Pilot Plant Annual Site Environmental Report 2003

Report addressing operational environmental monitoring activities.

DOE/WIPP 04-3231
Compliance Recertification Application

The recertification application showing how WIPP continues to meet all applicable federal transuranic radioactive waste standards.

DOE/WIPP 05-2225
Waste Isolation Pilot Plant Annual Site Environmental Report 2004

Report addressing operational environmental monitoring activities.

DOE/WIPP 06-2225
Waste Isolation Pilot Plant Annual Site Environmental Report for 2005

Report addressing operational environmental monitoring activities.

DOE/WIPP 07-2225
Waste Isolation Pilot Plant Annual Site Environmental Report for 2006

Report addressing operational environmental monitoring activities.

DOE/WIPP-07-3372 Rev. 8 WIPP Documented Safety Analysis Page Change 001
Approved: September 19, 2022; Effective: September 30, 2022
The Documented Safety Analysis addresses all hazards (both radiological and nonradiological) and the controls necessary to provide adequate protection to the public, workers, and the environment. The WIPP DSA demonstrates the extent to which the Waste Isolation Pilot Plant can be operated safely with respect to workers, the public, and the environment.

DOE/WIPP-07-3373 Rev. 8 WIPP Technical Safety Requirements Page Change 001
Approved: September 19, 2022; Effective: September 30, 2022
Technical Safety Requirements (TSRs) for the Waste Isolation Pilot Plant (WIPP) identifies the controls, derived in the DOE/WIPP-07-3372, WIPP Documented Safety Analysis, required to protect the public, workers, and the environment.

DOE/WIPP 08-2225
Waste Isolation Pilot Plant Annual Site Environmental Report for 2007

Report addressing operational environmental monitoring activities.

DOE/WIPP 09-2225
Waste Isolation Pilot Plant Annual Site Environmental Report for 2008

Report addressing operational environmental monitoring activities.

DOE/WIPP-09-3424
Compliance Recertification Application - 2009

The recertification application showing how WIPP continues to meet all applicable federal transuranic radioactive waste standards.

DOE/WIPP-09-3427 Rev. 22
Waste Data System User's Manual

Effective Date: 08/29/24

DOE/WIPP 10-2225
Waste Isolation Pilot Plant Annual Site Environmental Report for 2009

Report addressing operational environmental monitoring activities.

DOE/WIPP 10-3457
TRU Waste Acceleration Plan Rev. 1

Effective Date: 05/11

DOE/WIPP 11-2225
Waste Isolation Pilot Plant Annual Site Environmental Report for 2010

Report addressing operational environmental monitoring activities.

DOE/WIPP 11-3474 Rev. 4
Waste Isolation Pilot Plant Electronics Management Policy Statement

Effective: September 2020

DOE/WIPP-11-3480, Rev. 1
U.S. Department of Energy Waste Isolation Pilot Plant Executive Order 13058, "Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace" New Mexico, Chapter 24, Article 16 NMSA 1978, as Amended City of Carlsbad, New Mexico, Code of Ordinances, Sec. 32-11 Eddy County, New Mexico, Resolution No. R-14-47 Compliance Policy (a/k/a "Smoking Policy")

Effective: November 2014

DOE/WIPP 12-3489
Waste Isolation Pilot Plant Annual Site Environmental Report for 2011

Report addressing operational environmental monitoring activities.

DOE/WIPP 13-3507
Waste Isolation Pilot Plant Annual Site Environmental Report for 2012

Report addressing operational environmental monitoring activities.

DOE/WIPP 14-3532
Waste Isolation Pilot Plant Annual Site Environmental Report for 2013

Report addressing operational environmental monitoring activities.

DOE/WIPP-15-8866
Waste Isolation Pilot Plant Annual Site Environmental Report for 2014

Report addressing operational environmental monitoring activities.

DOE/WIPP-16-3565, Rev. 7
Safety Evaluation Report Addendum for Incorporation of Page Change 001a into the Waste Isolation Pilot Plant Documented Safety Analysis, DOE/WIPP-07-3372, Revision 8, and Technical Safety Requirements, DOE/WIPP-07-3373, Revision 8

Effective: September 19, 2022

DOE/WIPP-16-3572, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2015

Report addressing operational environmental monitoring activities.

DOE/WIPP-17-3560, Volumes 1 and 2
Waste Isolation Pilot Plant Geotechnical Analysis Report for July 2015 - June 2016

DOE/WIPP-17-3589, Rev. 1
Basis of Knowledge for Evaluating Oxidizing Chemicals in Tru Waste

Effective: December 2018

DOE/WIPP-17-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2016

Report addressing operational environmental monitoring activities.

DOE/WIPP-18-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2017

Effective: 09/13/18
Report addressing operational environmental monitoring activities.

DOE/WIPP-19-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2018

Effective: 09/10/19
Report addressing operational environmental monitoring activities.

DOE/WIPP-20-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2019

Effective: 09/23/20
Report addressing operational environmental monitoring activities.

DOE/WIPP-21-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2020

Effective: 09/29/21
Report addressing operational environmental monitoring activities.

DOE/WIPP-22-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2021

Effective: 09/29/22
Report addressing operational environmental monitoring activities.

DOE/WIPP-23-2308, Rev. 0
Waste Isolation Pilot Plant Delaware Basin Monitoring Annual Report

Effective Date: 01/04/24
This document contains the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for lab analysis, QA requirements, program implementation procedures, and direction for the preparation and disposition of reports.

DOE/WIPP-23-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2022

Effective 09/29/2023
Report addressing operational environmental monitoring activities.

DOE/WIPP-24-3591, Rev. 0
Waste Isolation Pilot Plant Annual Site Environmental Report for 2023

Effective 09/25/2024
Report addressing operational environmental monitoring activities.


NM


OTHER

40 CFR Part 191 (External Link )
Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes.

40 CFR Part 194 (External Link )
Criteria for the certification and re-certification of the Waste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.

SW-846 (External Link )
Test Methods for Evaluating Solid Waste, Physical/Chemical Methods
This document provides test procedures and guidance recommended for use in conducting the evaluations and measurements needed to comply with the Resource Conservation and Recovery Act.

WP 02-EC.07 Rev. 9
WIPP Sustainable Procurement Plan
Effective Date: 01/13/2020

WP 02-EC.11 Rev. 13
WIPP Pollution Prevention Program Plan
Effective Date: 09/05/2018

WP 02-EC.14, Revision 0
Waste Isolation Pilot Plant Environmental Management System
Effective Date: 07/01/2020

EA02EC14-1-0, Revision 1
Waste Isolation Pilot Plant Environmental Policy Statement
Effective Date: 06/14/2023

WP 08-PT.08 Rev. 6
WIPP Centralized Procurement Program Plan
Effective Date: 08/03/2010

WP 08-NT1003 Rev. 8
Waste Data System - Completion of Access Request Form and Assignment of Permissions in WDS - Management Control Procedure
Effective Date: 10/01/2024

EA08NT1003-1-0 Rev. 3
Waste Data System Access Request Form
Effective Date: 10/01/2024